
First-article and batch inspection: agreeing checks by feature
Agree which features and parts are checked at each inspection stage. A first-article result does not establish that an entire batch has been inspected to the same scope.
Read articlePractical notes on multi-axis machining, wire EDM, inspection planning and finishing.

Agree which features and parts are checked at each inspection stage. A first-article result does not establish that an entire batch has been inspected to the same scope.
Read article
A useful CMM report links drawing features to the datum system, inspected parts and measurement results. Define the critical characteristics and reporting scope before measurement.
Read article
Confirm which dimensions and threads are accepted before or after finishing. Define treatment areas, masking boundaries and contact restrictions from the part's function and drawing.
Read article
Choose positioning or simultaneous motion from tool access, surface geometry and datum relationships. More axes do not by themselves guarantee the required part tolerance.
Read article
Temperature, residual stress and clamping can each shift a machined part's dimensions. Plan roughing, support, cooling and inspection state together when reviewing 7050-T7451 work.
Read article
Use milling for accessible faces and blind features, and review wire EDM for conductive through profiles. Agree wire entry conditions and datum transfer before confirming the process sequence.
Read articleYour next component starts here
Material, quantity, critical dimensions and a target date are a good place to start.